News

News
What Certifications Should You Request Before Buying Underground Tunneling Equipment?

18-11 2026

What Certifications Should You Request Before Buying Underground Tunneling Equipment?

What Certifications Should You Request Before Buying Underground Tunneling Equipment? This guide explains which compliance documents, factory records, and test evidence to verify with Weishi before purchase.

View More >
How to Improve Cutting Efficiency When Excavating Hard Rock Tunnels

17-11 2026

How to Improve Cutting Efficiency When Excavating Hard Rock Tunnels

This guide explains how to improve cutting efficiency when excavating hard rock tunnels through geology checks, machine and tool preparation, controlled cutting, mucking coordination, maintenance, and performance monitoring.

View More >
How to Choose a Reliable Supplier for Underground Tunneling Equipment?

16-11 2026

How to Choose a Reliable Supplier for Underground Tunneling Equipment?

Learn how to choose a reliable supplier for underground tunneling equipment by defining project requirements, checking technical and manufacturing capability, comparing lifecycle costs, and verifying service, references, and contract protections.

View More >
How to Choose the Best Hard Rock Roadheader Based on Rock Hardness and UCS Values

13-11 2026

How to Choose the Best Hard Rock Roadheader Based on Rock Hardness and UCS Values

This guide explains how to choose a hard rock roadheader by interpreting UCS and site conditions, checking cutting power and machine specifications, comparing suppliers, and avoiding common purchasing mistakes.

View More >
Common Cutter Wear Problems in Hard Rock Roadheader Machines and How to Reduce Them

12-11 2026

Common Cutter Wear Problems in Hard Rock Roadheader Machines and How to Reduce Them

Common Cutter Wear Problems in Hard Rock Roadheader Machines and How to Reduce Them: Weishi-focused steps for diagnosing pick wear, improving cutting practice, and reducing unplanned downtime.

View More >
12345678...1213

Require More Customized Productsand Technical Advice?

Send over your requirements and we can offer one-stop technical advice and Industry solutions to meet your needs.

Contact Us Now >

Projects & Case Studies

EBZ280A Hard Rock Roadheader Case Study at Datong Coal Mine
Excavation Section: 6.0m (width) × 4.9m (height)
Shanxi Coal Mine
Excavation Section: 5.5m (width) × 5.0m (height)
Yangquan Coal Mine
Excavation Section: 6.5m (width) × 4.5m (height)