Nov.19,2026
Share:
Double Speed Roadheader maintenance is essential for reducing unplanned downtime, protecting high-value components, and keeping cutting performance consistent. A reliable program combines inspections before and after shifts, scheduled servicing, safe repair procedures, and accurate maintenance records. Because configurations and service intervals vary, always use the operation and maintenance manual for the exact machine model as the controlling reference.
For buyers, fleet managers, and maintenance teams, the practical goal is to improve availability without increasing safety risks or replacing parts too early. This guide explains the steps, tools, checks, and common errors that help achieve that goal. Weishi supports mining equipment users with product information and service guidance.
Confirm the machine model, serial number, approved lubricants, inspection points, tightening requirements, and service intervals. Check whether the roadheader has model-specific procedures for its two operating speeds, cutting system, hydraulic circuits, electrical equipment, and conveyor. The manual and site risk assessment take priority over general advice.
Park the machine in the designated service area on stable ground. Lower or secure attachments as specified, apply the parking brake, and isolate electrical, hydraulic, and other energy sources using the approved lockout and tagout process. Release stored pressure only by the manufacturer's procedure. Verify isolation before placing hands or tools near moving parts. Never inspect or repair a machine that could start unexpectedly.
Walk around the machine and look for fresh leaks, loose guards, damaged cables, missing fasteners, unusual wear, blocked ventilation, and debris around moving parts. Check that emergency stops, warning devices, lights, access steps, and protective covers are present and undamaged. Report defects that could affect safety or operation before starting work.
Record the date, operating hours, machine identification, inspection results, and any action taken. Clearly mark defects that require attention and tell the operator and maintenance supervisor. Do not rely on verbal handover alone, especially when a fault could affect cutting, braking, steering, travel, or emergency shutdown.
With the machine safely isolated, inspect the cutting head, picks or bits, holders, retainers, and nearby guards. Look for missing, seized, cracked, blunt, or unevenly worn cutting tools and evidence of abnormal contact. Replace damaged items with approved parts using the specified procedure. A worn or uneven cutting pattern can increase vibration, reduce cutting efficiency, and put extra load on the drive system.
Check the loading area, conveyor chain or belt, flights, scrapers, rollers, sprockets, and transfer points as fitted. Remove accumulated material only after isolation and according to site rules. Look for excessive slack, uneven tracking, damaged flights, unusual noise, and material build-up that could cause blockage. Use the model-specific limits for adjustment rather than estimating tension by eye.
Look for wet areas, damaged hose covers, abrasion, bulges, loose supports, and leaking connections. Never use a hand to search for a pressurized hydraulic leak. A fine jet can penetrate skin and cause a medical emergency. If a leak is suspected, isolate and depressurize the circuit according to the manual, then use an approved inspection method and have qualified personnel repair it.
Check visible cable routes, connectors, cable supports, control enclosures, and protective covers for impact, heat, moisture, or abrasion damage. Confirm that emergency stops and other safety devices are unobstructed and function-tested only as directed by the site procedure and manufacturer. Electrical repairs and testing must be carried out by authorized personnel using the correct isolation and test equipment.
Check the specified fluid levels and the condition of visible filters, breathers, coolers, and ventilation paths. Clean external surfaces and cooling areas using an approved method that will not force water or debris into electrical components, bearings, or seals. Use only the fluid grade and top-up procedure stated for the machine. Do not mix fluids unless the manufacturer explicitly permits it.
After inspection is complete, restore the machine to service only after all tools and personnel are clear and guards are in place. Start and test it in the approved sequence and in a controlled area. Listen for abnormal noise, observe for vibration or leaks, and verify that controls respond correctly. Test the two speed settings only as specified, without exceeding rated conditions or bypassing interlocks.
Maintain a service calendar that tracks both elapsed time and operating hours. A roadheader working in abrasive dust, high humidity, heavy cutting conditions, or frequent stop-start cycles may need more frequent inspection than a machine in lighter service. Follow the OEM schedule and site rules, and ask the authorized service provider to clarify any interval affected by severe conditions.
Identify each lubrication point from the manual and use the stated lubricant type and quantity. Clean grease fittings before connecting the grease gun so contamination is not pushed into the bearing. Apply lubricant at the specified interval and avoid excessive greasing, which can damage seals or trap heat and dirt. Record the lubricant used and the service date.
Check filter indicators and replace filters at the prescribed interval or when the manual requires it. Keep replacement fluid and filter containers clean and sealed until use. Before opening a system, clean the surrounding area and follow the specified pressure-release procedure. Dispose of used filters and fluids under site environmental requirements.
Inspect the specified structural connections, guards, mounting points, wear plates, and drive components for looseness or damage. Use a calibrated torque wrench only where the manual provides a torque value and tightening sequence. Do not retighten every fastener indiscriminately, because incorrect torque or sequence can damage threads, joints, or components.
Have qualified maintenance personnel inspect components that require specialist measurement, electrical testing, pressure testing, alignment checks, or internal examination. Plan these inspections before expected wear limits are reached, where possible. Early assessment can help schedule parts and labor during planned downtime instead of waiting for a failure underground.
The exact list depends on the roadheader model and the task. Commonly required items include:
Inspect tools before use. Do not use damaged sockets, improvised extensions, uncalibrated torque tools, or test equipment that is not rated for the intended task. Keep measurement tools clean and protected from impact. Verify calibration status where the tool or site procedure requires it.
Confirm the correct part number, dimensions, material, and specification before fitting a component. Check lubricant and fluid labels against the machine documentation. Keep parts clean during installation and protect open lines and ports from dust. If a specified part is unavailable, obtain engineering or manufacturer approval before substituting it.
Count tools before and after maintenance, remove rags and loose items, and dispose of waste correctly. A tool left inside a guard or near a conveyor can become a serious hazard when the machine returns to service. Store maintenance supplies in clean, labeled containers away from contamination and heat sources.
Compare cutting tool wear and cutting behavior across inspections. Uneven wear, repeated tool loss, unusual vibration, or a sudden change in cutting rate may indicate a problem with the tools, holders, cutting head, drive, or operating conditions. Stop and investigate abnormal changes rather than compensating by forcing the machine harder.
Confirm that the specified controls and indicators respond correctly and that the machine changes operating speed only through its approved procedure. Do not assume that every Double Speed Roadheader uses the same drive arrangement or speed-change sequence. If speed selection is inconsistent, noisy, or accompanied by overheating or warning alarms, stop operation as required and arrange a qualified inspection.
Watch for changes in response, pressure indications, fluid temperature, noise, or visible leakage. Compare readings only with the limits and measurement conditions stated by the manufacturer. A change in performance can result from several causes, including contamination, restricted cooling, worn components, or an incorrect fluid level. Do not adjust relief settings or alter control parameters without authorization.
Inspect the running gear and related components for damage, abnormal wear, contamination, and loose or missing parts. Test travel and braking only in the approved area and sequence. Any braking, steering, or travel fault that could affect control requires immediate reporting and action under the site safety procedure.
Observe whether material transfers smoothly without repeated blockages, spillage, or abnormal conveyor noise. Check for wear and damage at transfer points and confirm that material is cleared using safe isolation procedures. Persistent blockages may point to a mismatch between cutting rate and material handling capacity, damaged components, or an operating condition that needs review.
Record when the issue occurs, which function is affected, which speed setting is selected, relevant operating conditions, displayed warnings, and any recent maintenance. Compare the symptom with earlier records. Clear information helps technicians identify a cause faster and reduces unnecessary part replacement.
After the machine has been isolated as required, check for visible damage, blocked cooling paths, loose external connections, incorrect fluid level, or material build-up. Follow the diagnostic sequence in the manual. Do not open a pressurized circuit, bypass a safety device, or continue operating simply to reproduce a fault unless a qualified person has approved a safe test.
Stop and refer the issue to qualified personnel when there is a recurring alarm, unexplained overheating, repeated component failure, electrical damage, suspected internal leakage, abnormal drive noise, or any safety-system fault. Preserve fault codes and inspection findings where possible. Do not reset alarms repeatedly without finding and addressing their cause.
For every inspection or repair, record the machine identification, date, operating hours, work completed, parts fitted, fluids used, measurements, fault codes, and person responsible. Include defects that were identified but not repaired, along with the risk controls and follow-up date. Consistent records make recurring problems easier to identify.
Review the service history regularly for repeated cutting tool loss, filter blockage, overheating, leaks, conveyor wear, or electrical faults. Compare downtime and parts use with operating conditions rather than treating every failure as an isolated event. Use the findings to improve inspection frequency, operator training, parts planning, and maintenance scheduling.
Identify components that could cause extended downtime if unavailable, and confirm their correct part numbers with the machine documentation or an authorized supplier. Set stock levels using actual consumption, delivery lead times, storage requirements, and the consequences of a failure. Store seals, filters, electrical parts, and lubricants in conditions that prevent damage or contamination.
Make sure operators know which changes to report and which checks they are authorized to perform. Ensure maintenance staff understand isolation, stored-energy hazards, the machine's speed-selection procedure, and the limits of their qualifications. A consistent handover between operators and technicians helps turn early warning signs into planned work.
Use the service intervals in the manual for the exact model and track both operating hours and calendar time. Dust, workload, environment, and fault history can affect inspection needs. Do not replace the manufacturer's schedule with a generic interval.
Operators may perform checks that are permitted by site rules and their training, such as a visual walkaround and reporting defects. Repairs, electrical tests, pressure-system work, and tasks requiring specialist tools should be done by qualified personnel under the approved isolation procedure.
Stop and assess the machine according to the site procedure. Record when the change began and which function or speed setting was in use. Do not continue cutting to see whether the condition improves. Arrange a qualified inspection before returning the machine to work if the change could indicate a mechanical, drive, cutting, or safety problem.
Isolate before maintenance, inspect the machine, check safety devices, and report defects before operation. Use the correct tools, fluids, parts, and model-specific procedures.
Track hours, perform service at the specified intervals, investigate changes early, and keep a clear record of work and parts. Escalate faults beyond the team's qualifications rather than making unauthorized adjustments.
A disciplined maintenance program helps a Double Speed Roadheader deliver more consistent performance and makes repair planning safer and more predictable. For model-specific information and equipment support, contact Weishi through . Keep the manual, trained personnel, and site safety procedures at the center of every Double Speed Roadheader maintenance decision.
Require More Customized Productsand Technical Advice?
Send over your requirements and we can offer one-stop technical advice and Industry solutions to meet your needs.